Town: Stamford/Greenwich
Trail Conditions: Good
Observations/Information: I hiked the circuit around Mianus River Park. The trails were generally clear and mostly dry, except the low spots. I could see many spots that have been armored by the NEMBA gnomes, keeping people out of the squishy mud. There were plenty of people out on a mild Sunday afternoon: dog walkers with most dogs off leash, mountain bikers, and hikers.
Trail Ambassador Name: Tom Ebersold

Sunday, December 4, 2011

Mianus River Park

Date: December 4, 2011
Report Type: TA Report:
Trail Name: Mianus River Park
Town: Stamford & Greenwich
Trail Conditions: Good
Observations/Information: Paula and I rode Mianus on Sunday. This is becoming a regular destination for us because it's a cool place to ride. I rode the single speed this time and found it to be a great place for that type of bike with its undulating terrain and short steep hills. We rode the newly benched and armored Cabin Trail up to the old chimney and found it to be a dumping ground for candy wrappers. How sad. We spent some time on the older, unmaintained trails on the Greenwich side of the park (Greenwich doesn't allow maintenance). These trails are not as good as those on the Stamford side, but to get in a ride of decent length you have to include them.

The trails along the river were a little moist; those away from it were just about the right tackiness for traction. Here was also less leaf cover than you'd expect. The West River Trail Spur, just off Merribrook Rd, has been blocked off. The River Road was busy with hikers and unleashed, energetic dogs, per usual on Sunday afternoon. We encountered a few other mountain bikers and I loaned one my mini pump. Sadly though, his tube was too far gone to hold air and he had to walk.

Trail Ambassador Name: Paula Burton, Glenn Vernes

Sunday, November 6, 2011

Mianus River Park

Date: November 6, 2011
Report Type: TA Report:
Trail Name: Mianus River Park
Town: Stamford
Trail Conditions: Very good, clear and dry.
Observations/Information: Paula and I rode Mianus on Sunday the Sixth. We parked at the red barn and were lucky to find a space. The trails near the river were extremely crowded with walkers, dog people, and stroller-pushers- not surprising on a sunny Sunday afternoon. Once away from the river we practically had the trails to ourselves. We found some evidence of damage from the October snow storm but very little- no blocked roads or trails.

Mianus is a cool place. The trails we rode are fun and technically challenging but not overwhelming- intermediate level stuff. No prolonged climbing but a lot of up-and-down. There's supposed to be some pretty radical freeride-type stuff as well, but we didn't sample that. The trails are well cared for with rock armoring, benching, and re-routing of some of the older stuff. It's an example of what a dedicated friends group can do for a park.

The best trail we rode is the New Trail. It was obviously built by mountain bikers because it winds serpent-like through the woods with benched sweepers, armored sections, and rocks alongside to play on. A great trail, and if you haven't tried it you should.

Mianus is clear of storm damage and would be a great place to ride right now.

Trail Ambassador Name: Paula Burton, Glenn Vernes

Saturday, June 18, 2011

TM Report: Mianus River Park

   

Date: 6/18/2011
Report Type: TM Report:
Trail Name: Mianus River Park
Town: Stamford
Trail Conditions: damp, buggy
Observations/Information: Met Ryan Tucker at Merriebrook road entrance and we load some of my tools in his truck and drove around to back entrance to save time. Ryan drove completely in to the "New Trail" re-route we have been working on. We continued the benching and later on Mike Burke came in to assist

TM Hours: Ryan/Dave = 4.5 Mike 3
Trail Ambassador Name: Dave Francefort

Sunday, June 12, 2011

TM Report: Mianus Park

Date: 6/12/2011
Report Type: TM Report
Trail Name: Mianus Park
Town: Stamford
Trail Conditions: Damp
Observations/Information: Hiked out to the re-route on the "New Trail" continuing on the bench cutting
Trail Ambassador Name: David Francefort

Saturday, May 7, 2011

TM Report: Mianus Park

   


Date: 5/7/2011
Report Type: TM Report
Trail Name: Mianus Park
Town: Stamford
Trail Conditions: Dry
Observations/Information: Monthly trail maintenance session, had a group of 10 including TA's Ryan Tucker, David Francefort and Rich Coffey.

 We had 3 projects we worked on today, blocking the braids on meander trail, which included adding choke stones and branches/leaves to define the trail better. Also a small crew hiked out and tackled a mud issue on cabin trail, which required rock armoring. The remainder of the crew hiked out to where the road has been washedd out by the drainage pipe and require rock fill and a lot of dirt. The grade has been brought back up with a grade dip which should slow the water flow and help in soil retention.
Trail Ambassador Name: Ryan Tucker, David Francefort, Rich Coffey


Saturday, April 2, 2011

TM Report: Mianus


   

Date: 4/2/2011
Report Type: TM Report
Trail Name: Mianus
Town: Stamford
Trail Conditions: Damp
Observations/Information: Rock pitching project: Had 7 volunteers along with 3 TA's and rock armored a steep fall-line section, used anchor boulders every 6 feet or so for the 30+ foot section. After it was complete 3 mountain bikers were able to test it in both directions.



Trail Ambassador Name: Ryan Tucker, David Francefort, Rich Coffey

Saturday, January 29, 2011

TA Report: Mianus River Park 1-29-11


  


TA Report: Mianus River Park
Date of Activity: Saturday, January 29th, 2011
Location: Mianus Park
Condition of Trails: Snow covered and Hard-packed (but too soft for riding)
Observations:
I was cooped up, busy behind a desk for over a month and had to get out so I finally buttoned up and headed over to Mianus late afternoon Sat. for a quick hike. I was curious how the trails looked after so much snow. Sadly, the sun disappeared by the time I got there but the park was still beautiful with heaps of snow blanketing everything.
It's a popular park and all the trails were hard-packed. I met a few dog-walkers, snowshoers and a XC skiers on my hike but no bikers and not the tell-tale sign of bike tread on any of the packed trails. (Even through its hard-packed, it's pretty hard to get much traction on snow this thick and the bike's weight might mess it up for XC skiers.)

Mianus River

I headed north along the river on River Trail and Meander, headed up New Trail and circled back down by the river. I then wandered in on Inner Road and headed up to Peak Trail and Ridge Run before heading out.
Although the snow was really deep, every trail was was packed down. By the time I left, darkness was creeping in and the white ground became gray and featureless in the fading light.
I snapped a few photos but, as mentioned, too bad it was overcast.

Saturday, October 2, 2010

TM Report: Mianus Park

Date of Activity: 10/2/10
Condition of Trails(s): Damp


Trail Ambassador Name: David Francefort, Rich Coffee, and 3 Volunteers

Observations: The trail maintenance Saturday was all about vandalism.  Recently the park has been hit with an enormous amount of vandalism, many of the trail signs which are affixed to buried 4x4 posts were uprooted, destroyed and mostly taken or toss far away in the woods.   This TM session started long before 9AM, as Ryan and Rob, prepped the sign posts by cementing them in large buckets (3-5 gallons) and Rob rotozip the trail names in wood.   We all met at the bridge by the Red Barn and Bob had all 6 signs and cemented posts in his truck, so we added tools and he drove his truck in and the rest of us enjoyed a nice stroll in.  Along the way a lot of branches were cleared of the road from the recent storms.  We did the inner trail / Main road intersection first, which went very quickly due to the easy digging.  The next stop was Peak and Swamp sign, we could not get the truck very close so we used my rock crib to load the next 2 cemented sign posts.   Four of us hauled the crib up to Peak trail taking many of stop to rest, since we were hauling 200-300lbs.  Up at peak trail / look intersection we quickly dug for the post and secured the signs.   A decision was made to close the trail braid at the look out used by an old mountain biking trail that was closed a few years ago.  Since the best way to block any trail is with a choke stone the hunt began for the perfect stone.   We found a 500+ pounder about 100 feet away and used the rock crib to bring it over, slowly and I mean slowly, it took 30+ minutes to haul but now in place there is no moving it.  We finished up by install the next 2 sign posts.   These post now buried with the 50 - 100lbs of cement are not going anywhere!

Saturday, September 4, 2010

TM Report: Mianus River Park

Date of Activity: September 4
Trail Ambassador Name: K Mistretta-Tucker, R Tucker, C Keczkemethy, and R Coffey, and 4 other volunteers
Condition of Trails(s): Extremely dry, we need some serious rain.
Observations: As always, keep an eye out for other users on crowded days.
Trail Maintenance hours: 3 hours by 8 volunteers
Work accomplished: Re-route of steep, erosion prone, fall line section of Laurel Trail near the Hill and Ridge Run Intersections

Pictures and description of work here:
http://www.vizettes.com/mrp-trailmaintenance/projects/9-4-10/index.htm

Tuesday, August 10, 2010

TM Report: Mianus River Park

Date of Activity: June 5
Trail Boss Name: R Tucker, K Mistretta, D Francefort, Chris K., Rich C.; 40 volunteers

Condition of Trails(s): Several Project areas
Observations: Trail widening needs to be rehabilitated, install a hardened river access, and choke/rehab river side habitat
Trail Maintenance: 44 x 3 hours
Work accomplished: Rehabilitated, armored, choked, and narrowed the Meander Trail over roughly 500 yards. Installed deer fencing and river bank restoration area. Good mix of volunteers from Trout Unlimited, Greenwich Associates, CT NEMBA, Meet up, and the Friends of Mianus RP. Great day of work with some great refreshments and food afterwards, sorry for the delay in writing up!

TA: Report: Mianus River Park

Date of Activity: August 9
Trail Ambassador Name: R Tucker

Condition of Trails(s): Stay off river side trails.
Observations: Some snags down from the storm a couple weeks ago.
Trail Maintenance: 30 mi
Work accomplished: removed trees along cave trail before the Pine Hill rd. and cut back some growth. Also replaced rocks that were removed from a rock garden. If you're not working directly with the Friends of MRP or the Land owners, please improve your skills and not the trails.

Friday, July 23, 2010

TA Report: Mianus River

Date of Activity: July 22
Trail Ambassador Name: R Tucker, K Mistretta, M Burke

Condition of Trails(s): Stay off river side trails. Watch out for downed trees.
Observations: River side trails look like they had some wash, please stay off river side trails. Downed trees, limbs, and derailier killing sticks all over, watch your lines.
Trail Maintenance hours: 2.25 hours,
Work accomplished: removed Hill Trail/Ridge run deadfall, removed Peak Trail deadfall, removed Pine Hill Rd deadfall, removed Cave Trail deadfall. Reclosed Hill Trail rock wall with deadfall, rocks, and other debris. Don't undo blocked trails as trails are blocked or rerouted with land owner approval, trail vandals will be reported to town of Stamford and Stamford PD.

Thursday, May 27, 2010

National Trails Day: Mianus River Park

Mianus River Park National Trails Day Event (Stamford @ 9am June 5th, 2010):

Join CT NEMBA and the Friends of Mianus River Park June 5th for National Trails Day. We'll be giving back to the trails in the morning doing trail maintenance, which will be followed by Lunch and then enjoying the trails on a group ride. The day begins at 9am, meeting on the Stamford side of the Park (here) near the Stone Bridge below the Red Barn. We'll work on a number of projects on the Stamford side with the leadership of CT NEMBA trained trail bosses until around 12/12:30 and then grab Pizza back at the Red Barn. The group ride after lunch that will cover ~7-8 miles of intermediate riding, if we have numbers we can break into advanced and beg/intermediate groups.

Bring gloves, sturdy shoes, a hat, bug spray, and water for the Trail Maintenance. For the ride bring water, helmet, and regular riding gear.

If you have any questions about the day please contact MianusTM@gmail.com

Tuesday, May 4, 2010

Re: Mianus Monthly TM Trail Report

Date of Activity: May 1

Trail Ambassador Name: K Mistretta-Tucker, R Coffey, R Tucker, D Francefort, and 10 other volunteers

Trail Ambassador Email: rrtucker at gmail dot com

Town: Stamford

Location: Mianus River Park

Trail(s) Ridden: Stamford Trails

How did you use the trail: Trail Maintenance


What was the time of day: 9am-12:00pm

Duration (Hours): 3.0

Distance (Miles): N/A

Condition of Trails(s): Fall Line in need of re-route

Observations: Re-route checked post heavy Monday and Tuesday rains. Holding well.


Trail Maintenance hours: 3.5 hours

Work accomplished: Re-routed eastern edge of Cabin Trail off fall line using sustainable techniques such as bench cutting, rock armoring, and contouring trail along hillside

Wednesday, April 28, 2010

Trail Ambassador Report - Mianus River Park

Date of Activity: April 28
Trail Ambassador Name: R Tucker
Trail Ambassador Email: rrtucker at gmail dot com
Town: Stamford
Location: Mianus River Park
Trail(s) Ridden: Perimeter Loop from Stamford to Inner loop back to Stamford
How did you use the trail: Riding
What was the time of day: 6:45am-7:45am
Duration (Hours): 1 hours
Distance (Miles): 5 miles
Condition of Trails(s): Stay off river side trails. Otherwise trails were perfect with a wee tack to them.
Observations: Everything above/away from the river was good, riverside trails aren't in condition for riding. Someone removed our Cabin Trail Reroute pin flags, the bootleg block on Peak Trail was still in place from Friday last week.
Trail Maintenance hours: 0.25hours
Work accomplished: Blocked bootleg along new trail re-route with brush.

Tuesday, April 13, 2010

Mianus Monthly TM Trail Report

Date of Activity: April 3 (Pre-work April 1)
Trail Ambassador Name: K Mistretta-Tucker, R Coffey, R Tucker, D Francefort, and 4 other volunteers
Trail Ambassador Email: rrtucker at gmail dot com
Town: Stamford
Location: Mianus River Park
Trail(s) Ridden: Stamford Trails
How did you use the trail: Trail Maintenance
What was the time of day: 9am-12:30pm (Pre-work Thursday April 1, D Francefort, K Mistretta-Tucker, R Tucker; SLCT Walk thru April 2 1 hour - R Tucker)
Duration (Hours): 3.5 hours (2.5 hours prework)
Distance (Miles): N/A
Condition of Trails(s): Fall Line in need of re-route
Observations: Did walk through with Chief Steward from SLCT Friday for approval of re-route.
Optional
Trail Maintenance hours: 3.5 hours
Work accomplished: Re-routed western edge of Cabin Trail off fall line using sustainable techniques such as bench cutting, rock armoring, and contouring trail along hillside.

Thursday, April 8, 2010

CT Chapter and Mianus River Park in the News!

Forging a path: Volunteers rebuild trails in Stamford's Mianus River Park
Elizabeth Kim, Staff Writer
Published: 09:50 p.m., Wednesday, April 7, 2010

Excerpt:
STAMFORD -- In the northern reaches of Mianus River Park, not far from a glistening river, a cluster of T-shirt-clad outdoor lovers stood in a small clearing with their backs bent and legs muddied ...

As part of a joint effort with the Connecticut Chapter of the New England Mountain Bike Association, Sofman and several others underwent training in trail maintenance techniques.

On Saturday, Ryan Tucker, the trail maintenance coordinator, instructed the team on how to make a "bench cut," a trail-building method involving cutting in a sloped hill that dates back to the 1920s.

"Most of this stuff is tried and true," he said.

Nearby, another team was busy "armoring" a section of the trail. It involves placing rocks to harden areas where water tends to collect.

"It's like a jigsaw puzzle," said Dave Francefort, another volunteer.

Another group member, Rich Coffey, added, "The tighter they fit, the more the two rocks will match each other and the longer they will stay solid."

As proof of the quality and value of their handiwork, Coffey pointed to the recent torrential downpours.

"The storm did a lot of damage," Coffey said. "But in every place where we built trails, they are still really solid."

Last year, Coffey's 16-year-old son, Gregory, also got involved in the effort.

Along with Francefort, the three are avid mountain bikers, one of the primary users of the park.

At the mention of the sport, Coffey gave a sly smile.

"There's an ulterior motive," he said. "We get to ride what we fixed."


Sunday, March 28, 2010

TA Report: Mianus River Park

Saturday, March 27th, 2010
Condition of Trails: Wet and soft everywhere, standing water pooling up in many places, fallen tees still blocking a few of the trails and loose debris (busted branches, etc.) hinders smooth riding in many spots

Trail Ambassador Name: Rich C,
Trail Ambassador Email: mtnbikerdad[at]yahoo[dot]com
Town: Stamford/Greenwich
Location: Mianus Park
Trails Ridden: Various
How did you use the trail?: Mountain BIking
What was the time of day? Afternoon
Duration (Hours): 3 1/2 hours

Observations:
I rode most of the park (joined on occasion by my son and his friend) and was astounded at how much damage from the storm still exists. Although our crew was in last week and--in conjuction with a Treetops crew--cleaned up a lot of the damage and have rerouted many of the trails as a result of tree falls; the park was hit really bad by the storm and the constant wet weather has taken it's toll.

Almost every major trail had either standing water, mud for miles or large trees blocking the flow. This park will take a while to recover. Any help is always appreciated (TM every 1st Sat of the month)

Sunday, March 21, 2010

TM Report: Mianus River Park

Date of Activity: March 21, 2010
Condition of Trail: Highly erroded and in need of a serious re-route

Trail Ambassador Name: D Francefort and R Tucker
Email: rrtucker@gmail.com
Town: Stamford
Location: Mianus River Park
Trail(s) Ridden: Cabin Trail
How did you use the trail? Hiking
What was the time of day? Morning, 9-10:30am
Hours riding: 1.5

Encounters & Observations: We met with the Stamford Land Conservation Trust, the land owners of the Cabin Trail parcel, to discuss re-routing two serious fall line trails. We walked the Cabin Trail and identified the issues related to and caused by the two fall lines, and the new routes, as well as the rationale for the re-routes, with the SLCT President and Parcel steward.

Re-route is tentatively planned for April 3rds regular Friends of Mianus River Park Trail Maintenance session that meets at 9am the first Saturday of every month at the Stone Bridge on Marriebrook Ln in Stamford.