TM Report: Mianus Park



Date of Activity: 02/15/10
Condition of Trails(s): Packed Snow

Trail Ambassador Name: David Francefort, Ryan Tucker, Kyaiera Tucker
Trail Ambassador Email: dfrancefort@excite.com
Town: Stamford
Location: Mianus River Park
Trail(s) Ridden: N/A
How did you use the trail?: Trail Maintenance
What was the time of day?: 9:15AM
Duration (Hours): 2.5
Distance (Miles): N/A
Observations: Last year the Mianus TM crew did a trail reroute because of a fall line issue and erosion on a short steep section. Since performing this reroute some individuals keep reopening the section and removing all the logs and brush used to block this 50ft section of trail. The rock wall at the top had a gap that the original trail went through, last year we start the process of continuing the existing wall across but the wall we start was partially removed. Today we rebuilt the wall adding additonal rock, but the wall need to be built higher to match the existing wall.