Sunday, July 19, 2009

TA Report: Wilton Woods

Date of Activity:07-18-09
Condition of Trails(s): Wet, muggy, muddy, buggy!


Trail Ambassador Name: David Francefort
Trail Ambassador Email: dfrancefort@excite.com
Town: Wilton
Location: Wilton Woods
Trail(s) Ridden: N/A
How did you use the trail?: Trail Maintenance
What was the time of day?: 7AM
Duration (Hours): 3.5
Distance (Miles): N/A
Observations: Multi-project day: 1) re-routed a small section on the black trail that was too tight of a turn and was continually muddy. 2) Armor bank turn on black trail 3) repaired teeter-totter on black trail 4) raked out new final trail re-route at end of black trail due to erosion / mud. 5) Tore out 75 foot section of armor on orange trail and complete reset each rock properly with entire section now level and locked in with large stones buried deept every 8-10 feet. Used alot of deet, heavy with bugs.

No comments: