Date: 12/24/2011
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: damp
Observations/Information: Completed re-route of 100 foot section of orange trail that was destroyed by a blockage in the river and over flowed the banks. Benching was easy, just need to blaze
Trail Ambassador Name: David Francefort
CT Trail Locations
Showing posts with label Wilton Woods. Show all posts
Showing posts with label Wilton Woods. Show all posts
Saturday, December 24, 2011
Friday, December 23, 2011
TM Report: Wilton Woods
Report Type: TM Report:
Trail Name: Wilton Woods
Town: WILTON
Trail Conditions: WET
Observations/Information: Ryan Tucker and I tackled the removal of a huge tree in the river on the orange trail. This tree has created a dam that has raised the water level behind the tree 2 feet higher and after a rain the river swells even more and breaches the bank. The trail has completely been destroyed for about 75-100 feet; an approved re-route not has to be put in, currently there is a temporary re-route
Trail Ambassador Name: David Francefort
Monday, December 19, 2011
TM Report: Wilton Woods
Date: 12/19/2011
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Dry
Observations/Information: Finished cutting down some widow makers on the blue trail; flagged the re-route on the orange; began chain sawing the trees blocking the river on the orange trail; Also had a 1 hour meeting with WCC regarding projects. (2 hours TM / 1 hour meeting-planning)
Trail Ambassador Name: David Francefort
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Dry
Observations/Information: Finished cutting down some widow makers on the blue trail; flagged the re-route on the orange; began chain sawing the trees blocking the river on the orange trail; Also had a 1 hour meeting with WCC regarding projects. (2 hours TM / 1 hour meeting-planning)
Trail Ambassador Name: David Francefort
Saturday, December 17, 2011
TM Report: Wilton Woods
Date: 12/17/2011
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Damp
Observations/Information: Armored about 30 feet of the end of the Red trail and dug a drainage ditch to help remove water. Continued armoring by Raptor. Will need to chain saw out a large limb in order to move the trail over about 15 feet to higher drier ground
Trail Ambassador Name: David Francefort
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Damp
Observations/Information: Armored about 30 feet of the end of the Red trail and dug a drainage ditch to help remove water. Continued armoring by Raptor. Will need to chain saw out a large limb in order to move the trail over about 15 feet to higher drier ground
Trail Ambassador Name: David Francefort
Sunday, December 11, 2011
TM Report: Wilton Woods
Date: 12/11/2011
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Wet
Observations/Information: Continued work on the Re-routed an approved 300+ section of the blue trail which required extensive benching and rock armoring; Also raked in a temp trail on orange as trees fell in river creating a dam and the water now has crested the bank and the river is now going down the trail for 50 feet then going back in the river
Trail Ambassador Name: David Francefort
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Wet
Observations/Information: Continued work on the Re-routed an approved 300+ section of the blue trail which required extensive benching and rock armoring; Also raked in a temp trail on orange as trees fell in river creating a dam and the water now has crested the bank and the river is now going down the trail for 50 feet then going back in the river
Trail Ambassador Name: David Francefort
Saturday, December 10, 2011
TM Report: Wilton Woods
Report Type: TM Report:
Trail Name: Wilton Woods
Town: WIlton
Trail Conditions: Wet
Observations/Information: Re-routed an approved 300+ section of the blue trail which required extensive benching and rock armoring; we had 4 NEMBA workers (Ryan T., Paula B., Chris K and myself) along with 2 park riders
Trail Ambassador Name: David Francefort
Sunday, November 27, 2011
TM Report: Wilton Woods
Date: 11/27/11
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: wet
Observations/Information: cleared the last of the trees and armored the red trail
Trail Ambassador Name: dave Francefort
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: wet
Observations/Information: cleared the last of the trees and armored the red trail
Trail Ambassador Name: dave Francefort
Saturday, November 26, 2011
TM Report: Wilton Woods
Date: 11/26/11
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Wet
Observations/Information: Worked on the large tree across the blue trail by the boas lane lot...30+ inch tree quite the challenge....but nearly done
Trail Ambassador Name: Dave Francefort
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Wet
Observations/Information: Worked on the large tree across the blue trail by the boas lane lot...30+ inch tree quite the challenge....but nearly done
Trail Ambassador Name: Dave Francefort
Saturday, November 19, 2011
TM Report: Wilton Woods
Date: 11/19/2011
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Dry
Observations/Information: Worked on clearing a 2 foot diameter tree that was up rooted and was blocking the trail, 2 hours of chain sawing and the trail is back open. Then proceeded to Boas lane to begin work on cutting up another verg large tree
Trail Ambassador Name: Dave Francefort
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Dry
Observations/Information: Worked on clearing a 2 foot diameter tree that was up rooted and was blocking the trail, 2 hours of chain sawing and the trail is back open. Then proceeded to Boas lane to begin work on cutting up another verg large tree
Trail Ambassador Name: Dave Francefort
Saturday, November 12, 2011
Wilton Woods
Date: 11/12/11
Report Type: TM Report:
Trail Name: Wilton Woods
Town: WIlton
Trail Conditions: leafy, dry
Observations/Information: Still more trees to clear, managed to do half of back blue and orange and white.
Trail Ambassador Name: David Francefort
Report Type: TM Report:
Trail Name: Wilton Woods
Town: WIlton
Trail Conditions: leafy, dry
Observations/Information: Still more trees to clear, managed to do half of back blue and orange and white.
Trail Ambassador Name: David Francefort
Saturday, November 5, 2011
Wilton Woods
Report Type: TM Report:
Trail Name: Wilton Woods
Town: WIlton
Trail Conditions: Damp, Blow Downs
Observations/Information: A tree or large branch about every 100 feet or so made for a long day of chain sawing. Completed Blue West to Red, Red, Orange back to Branch Brook, Blue East to Orange, White
Trail Ambassador Name: David Francefort
Monday, September 5, 2011
TM Report: Wilton Woods
Date: 9/5/2011
Report Type: TM Report:
Trail Name: Wilton Woods
Town: WIlton
Trail Conditions: Dry
Observations/Information: Continue up blue trail where I have identified another 6-8 large down trees.
Trail Ambassador Name: david francefort
Report Type: TM Report:
Trail Name: Wilton Woods
Town: WIlton
Trail Conditions: Dry
Observations/Information: Continue up blue trail where I have identified another 6-8 large down trees.
Trail Ambassador Name: david francefort
Sunday, September 4, 2011
Wilton Woods
Date: 9/4/2011
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Dry
Observations/Information: Continue chain sawing down tree, hiked up blue east and immediately was block by 4 down trees, this took 2 tanks of gas and 2 hours to cut and remove all the down fall
Trail Ambassador Name: David Francefort
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Dry
Observations/Information: Continue chain sawing down tree, hiked up blue east and immediately was block by 4 down trees, this took 2 tanks of gas and 2 hours to cut and remove all the down fall
Trail Ambassador Name: David Francefort
Wednesday, August 31, 2011
Wilton Woods
Date: 8/31/2011
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Blow Downs everywhere
Observations/Information: Task was to open blue to red and orang back to car for mountain biking.
We have crew of 5, including TA Ryan Tucker
Trail Ambassador Name: David Francefort
Report Type: TM Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Blow Downs everywhere
Observations/Information: Task was to open blue to red and orang back to car for mountain biking.
We have crew of 5, including TA Ryan Tucker
Trail Ambassador Name: David Francefort
Saturday, July 23, 2011
Wilton Woods
Date: 7/23/2011
Report Type: TA Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Dry, Buggy
Observations/Information: Place is rippin fast, hooked up with some new peeps so I gave them a tour
Trail Ambassador Name: David Francefort
Report Type: TA Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Dry, Buggy
Observations/Information: Place is rippin fast, hooked up with some new peeps so I gave them a tour
Trail Ambassador Name: David Francefort
Saturday, July 16, 2011
Wilton Woods
Date: 7/16/2011
Report Type: TA Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Dry, Fast
Observations/Information: Gave a tour of the entire park to a couple of riders. We hit up all the goodies. I did give directions for a good loop to a couple of riders in the parking lot and we actually ran into one of them out on the trail and they said they were having a fantastic time exploring the park
Trail Ambassador Name: David Francefort
Report Type: TA Report:
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Dry, Fast
Observations/Information: Gave a tour of the entire park to a couple of riders. We hit up all the goodies. I did give directions for a good loop to a couple of riders in the parking lot and we actually ran into one of them out on the trail and they said they were having a fantastic time exploring the park
Trail Ambassador Name: David Francefort
Sunday, June 12, 2011
TM Report: Wilton Woods
Date: 6/12/2011
Report Type: TM Report
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Wet, Wet and Wet
Observations/Information: Last nights deluge of rain really made the trail wet. Hiked out to continue reclamation of blue trail re-route, also installed about 2 dozen knicks on the existing blue trail.
Trail Ambassador Name: David Francefprt
Report Type: TM Report
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Wet, Wet and Wet
Observations/Information: Last nights deluge of rain really made the trail wet. Hiked out to continue reclamation of blue trail re-route, also installed about 2 dozen knicks on the existing blue trail.
Trail Ambassador Name: David Francefprt
Saturday, June 11, 2011
TM Report: Wilton Woods
Report Type: TM Report
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: Wet
Observations/Information: Organized Trail Maintenance session to work on closing section of Blue trail. Reclamation included, digging up the trail tread, installing 5 check dams, bringing in top soil and transplanting around 50 plants/trees.
Trail Ambassadors: Ryan Rucker, David Francefort, Rich Coffey and Peter (volunteer)
Wednesday, June 1, 2011
TA Report: Wilton Woods
Date: 6/1/2011
Report Type: TA Report
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: damp, greasy
Observations/Information: Another Wilton Woods Wednesday NEMBA sponsored ride, we had 5 tonight in the group, including a person from Belgium here on business for 2 weeks, let him borrow one of my bikes and the guy has skills...We hit up all the fun stuff, with minimal stops because of the skeeters.
Trail Ambassador Name: David Francefort
Report Type: TA Report
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: damp, greasy
Observations/Information: Another Wilton Woods Wednesday NEMBA sponsored ride, we had 5 tonight in the group, including a person from Belgium here on business for 2 weeks, let him borrow one of my bikes and the guy has skills...We hit up all the fun stuff, with minimal stops because of the skeeters.
Trail Ambassador Name: David Francefort
TM Report: Wilton Woods
Date: 5/31/2011
Report Type: TM Report
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: damp, buggy
Observations/Information: Received approval to move a wooden bridge on a close trail across the park to the north white trail which has a small stream crossing it and a problematic wet area. I brought my mountaineering backpack and took 3 loads of about 70lbs each across the park about 1 mile and then rebuilt the bridge and began some rock armoring across the muddy area, but the skeeters started to get the best of me so I left and will return to complete the armoring.
Trail Ambassador Name: David Francefort
Report Type: TM Report
Trail Name: Wilton Woods
Town: Wilton
Trail Conditions: damp, buggy
Observations/Information: Received approval to move a wooden bridge on a close trail across the park to the north white trail which has a small stream crossing it and a problematic wet area. I brought my mountaineering backpack and took 3 loads of about 70lbs each across the park about 1 mile and then rebuilt the bridge and began some rock armoring across the muddy area, but the skeeters started to get the best of me so I left and will return to complete the armoring.
Trail Ambassador Name: David Francefort
Subscribe to:
Comments (Atom)



















