Date of Activity:6-6-09
Condition of Trails(s): Wet, some muddy
Trail Ambassador Name: David Francefort
Trail Ambassador Email: dfrancefort@excite.com
Town: Stamford
Location: Mianus Park
Trail(s) Ridden: N/A
How did you use the trail?: Trail Maintenence
What was the time of day?: 9:00AM
Duration (Hours): 3
Distance (Miles): N/A
Observations: Our standard first Saturday of the month, TM day at the park, about 8 volunteers showed up, broke up into 3 groups to tackle various projects, my son and I hiked out to the back of the park with chain saw and shovel in hand. I cut up a fallen tree that was blocking ant access road in, used the logs to make stuntery along side the trail. Next we headed to a drainage pipe that has been continuall rip out by someone and tossed aside. We dug down and buried the pipe underground. Headed back to assist on a muddy trail by the river that require numerous knicks to be placed for drainage.
No comments:
Post a Comment