Sunday, September 4, 2011

Trumbull-Pequonnock

   
Date: 9-4
Report Type: TM Report:
Trail Name: Pequonnock River Valley
Town: Trumbull
Trail Conditions: Varied
Observations/Information: New Trail Connector to the North Bridge

I spent some time last month (when time permitted) to build a new trail connecting the Rail Trail to the North Bridge and finished it on Sunday. The second alt route to the Bridge (besides the popular northern wash out) was a fall line as well and needed rerouting. Built to sustianable standards, the new trail is a fast bomb down and an easy ascent up. I noticed many tire treads on it early Monday morning so it seems to be assimilating into the Network very quickly.
PIC > nbridgeNewTrail1.jpg
PIC >nbridgeNewTrail2.jpg

Mini Map Here > http://www.vizettes.com/ttc/concerns-projects/nb-connector/nb-connector.htm

Trail Ambassador Name: Rich C

Trail Ambassador E-mail: mtnbikerdad[at]yahoo[dot]com
How did you use the trail? MT Biking
Trails Ridden:
Time of day: Evening
Time/Duration (hours):
Approximate Distance (Miles):
Images/Photos: nbridgeNewTrail1.jpg
2nd image: nbridgeNewTrail2.jpg
3rd Image:
4th Image:

No comments: