Condition of Trails(s): Dry
Trail Ambassador Name: David Francefort, Chris Keczkemethy
Trail Ambassador Email: dfrancefort@excite.com
Town: Wilton
Location: Bradley Park
Trail(s) Ridden: N/A
How did you use the trail?: Trail Maintenance
What was the time of day?: 9:00AM
Duration (Hours): 2
Distance (Miles): N/A
Observations: A long bridge was severely sagging because of improper construction, Chris and I brought in a hydraulic floor jack and jacked up the bridge and installed new supports overlapping the weak areas on the bridge. Also straightened the bridge by adding rocks under one end to get it level. We hiked to the back area of the park where there was a short walkway with a gap in between the boards wide enough for a mountain bike tire to get caught in, we disassembled and used new wood supports and reused the decking and re-assembled.
Two sets on dog walkers came by and thanked us for our efforts in the park and they also commented on how much they enjoyed the section of the orange trail that I re-routed last week.
No comments:
Post a Comment